Chagpori Tibetan Medical Institute

Chagpori Salugara (Pharmacy) 2016
The construction of the 1st floor of the pharmacy building resumed on 15th May 2016 after a long gap. This was partly due to paucity of funds and the change of contractor.


 

May 19, 2016
Sharing the details of the pharmacy construction plan with staff.

   

Bamboo stairs for carrying materials and on the right architect, Mr. Sangay Choephel.
   
Building the walls of the first floor.
   
 

 

Phelgye overlooking the closing of the facade.

   
 

Watering the walls and the outside terrace.

   
 
   
 
 
The North Facade and south eastern part of the building.
 
The southern facade
 
May 28, 2016
Main entrance.